ADMCO Steel Buildings Company manufactured and erected
the steel skeleton of Cavo Maintenance Center in Alqatamya
industrial zone Cairo. The area of this center is 1200 m2 with
free span 29 ms. The client Added 300 m2 of mezzanine floor
to be used as a spare parts store. This mezzanine is designed
on quite heavy live load 500 kg / m2. Some photos of that
project on our website in that link
http://www.admcosteel.com/flash.aspx