Damietta

 
Images in Damietta
 

 

   Damietta company Oils Factory
 
ADMCO Steel Buildings Company executed Damietta Oil
  
Factory project In Damietta Industrial Zone. The project
  
executed in 3 phases. The first was the Extractor Building, the
  
second was the Boiler House and the third was the
  
Preparatory Building. The weight of steel was 110 ton.
 
 The scope of our company was preparation of detailed
 
 drawings (Shop Drawings) for the three phases which varies
  
from simple portal frame to complicated layout of machines
  
arrangement.
 
 

 Phase I : Extractor Building

  
 
·        Length : 18 ms 
 
 ·        Width   : 16 ms
 
 ·        Height : 17 ms
 
 
·        It is a five levels of mezzanine floors
 
 

 Phase II : boiler House

  
 
·        Length : 18 ms 
  
·        Width   : 12 ms
  
·        Height : 8.5 ms
 
 
·        It is a simple portal frame
 
 

 Phase III : Preparatory Building

  
 
·        Length : 8 ms 
 
 ·        Width   : 5 ms
 
 ·        Height : 8.0 ms
 
 
·        It is a three levels of mezzanine foor
 
 
 
All fabrication and erection works finished in less than one
 
 year according to the main work schedule of the project
 
taking intoconsideration installing of the machines at each floor
 
 before erection of steel of the higher level. The project
 
handed  over the owner in the planned date with the warranty
 
period of  one year.
 